Installation of ensuite fittings
Who said that the lead-up to Christmas is usually quieter? I've been busy at work helping out with proposals writing. On the home renovations front, things have all been happening!
Our mixer taps arrived on Wednesday. We've installed it and tested it. It works beautifully! I was initially concerned about the possibility of water spilling over the round glass plate but even at full blast of the tap, this didn't happen.
Once the mixer tap was in and tested, Alastair siliconed the edges of the vanity unit. It's was a nice neat job!
On top of that, we also installed the toilet roll holder and towel holders. We had fun doing mini usability tests for both fittings, making sure that we can reach both items comfortably (also keeping in mind, future users of these fittings). We ended up relocating the towel holder to the same wall as the toilet fitting. The original spot for the towel holder would have resulted in a very cramp spot if you needed to stand in front of the sink (which you'll need to do on a daily basis).
It's all looking very good and coming together nicely. Our next biggest thing is the installation of the shower screen, which I have some slight trepidation about. We're going to have a go at it tomorrow before our friend's Christmas get together. I hope it all goes well as I want this completed before we fly back to Perth!
Things left to do:
Install drainage for vanitySilicon vanity edgesBuy taps- Install shower screen
- Do a overall clean of everything
- Reinstall downlight over sink
- Paint architraves (nearly completed - need to redo a small section of the door)
- Install dynabolts for toilet
Install waterfall mixer taps




